PREDICTABILITY

Process Overview

Fields Description
Process Name REL Predictability Report
Segment REL
Process Family Lenovo India
Process User(s) Wyzmindz solutions pvt ltd
Process Purpose This report is instrumental in providing actionable insights, tracking performance, and supporting Lenovo’s sales strategies

Version History

Version Tag Prepared By Date of Update/Revision Validated By Reviewed by Approved by Revision Details
V 1.0 Raksha S 20-12-2025 Navneeth Sushruth Vasista Vishwanath Mosale SOP Document Creation

Distribution and Access List

Designation Read Write Approval
Analyst Yes No No
Team Lead Yes Yes No
Manager Yes Yes Yes

1.1 Purpose

To track weekly commit versus actual performance by updating Order Load data with validated REL Predictability values for accurate weekly reporting.

1.2 Scope

  • Geographic Scope: India.
  • Business Segment: REL
  • Process Frequency: Tuesday
  • Core Activity: Update weekly commit and actual values in the Order Load report using REL Predictability data and standardize values for reporting.
  • Key Distributors Covered: Lenovo

1.3 Business/Segment Overview

  • Pending.

1.4 Responsibility and authority

  • Analyst : Raksha S
  • Process Owner : Navaneeth
  • Process Manager : Dayanand
  • Escalation Manager : Sushruth Vasista
  • Approval Authority : Vishwanath Mosale

1.5 Escalation matrix: (Wyzmindz and Lenovo)

Escalation Matrix – WyzMindz Solutions Pvt Ltd India

Sl No. Name Designation Email ID
1 Sushruth Vasista Manager sushruth.vasista@wyzmindz.com
2 Vishwanath Mosale Director Vishwanath.mosale@wyzmindz.com

Escalation Matrix – Lenovo India Pvt Ltd

Sl No. Name Designation Email ID
1 Pending. Pending. Pending.
2 Pending. Pending. Pending.

1.6 RACI Matrix:

RACI Matrix – WyzMindz Solutions Pvt Ltd India

Report / Process Responsible Accountable Consultation Informed
Predictability Raksha S Raksha S Navaneeth K Lenovo Ind Pvt Ltd, Wyzmindz – Lenovo Process Team

1.7 Access Required

  • Access to MS Office Suite

1.8 Overview of Tools

  • NA

1.9 Legends

Field Meaning
OL Orderload

1.10 Data Dependencies

  • Orderload report
  • REL Predictability Report

1.11 Schedule of Reporting

  • Pending :

1.12 Process Flow Chart

Process Flow Chart

1.13 Steps of Procedure

  • Open Sunday’s orderload report.
  • Open prvious week REL Predictability Report
  • Get Week commit values and divide by ‘1000’ in OL report.
    • =week commit/1000
  • Update value in below table as per week

Predictability Report

  • Get actuals values and divide by ‘1000’ in OL report
    • =week actual/1000
  • Update value in below table as per week & Actuals should Match with the OL Summary Table

Predictability Report

  • Drag the formula till current week in below table,

Predictability Report

  • Hide all empty (future weeks) columns.
  • Save the file in Current week name.

1.14 Output Overview

  • Pending

1.15 Validation checklist

  • Drag the formula to the right for updating the "Prediactability %age" and check all the formula for the week.
  • Check the SLBD commit ,actual, Prediactability %age formula.

1.16 Communication

Mode of Communication would be Email

Dayanand U du@lenovo.com, Sushruth Vasista svasista@lenovo.com; Navaneeth K nk@lenovo.com; Kiran kumar n Biradar kbiradar@Lenovo.com

1.17 Repository Details

NA.