MM WF

Process Overview

Fields Descripton
Process Name Regional MM WF
Segment SMB
Process Family: Lenovo India
Process User(s): Wyzmindz solutions pvt ltd
Process Purpose: This report is instrumental in providing actionable insights, tracking performance, and supporting Lenovo’s sales strategies

Version History

Version Tag Prepared By Date of Update/Revision Validated by Reviewed by Approved by Revision Details
V 1.0 Nadeem 21-12-2025 Sushruth Vasista Vishwanath Mosale SOP Document Creation

Distribution and Access List

Designation Read Write Approval
Analyst Yes No No
Team Lead Yes Yes No
Manager Yes Yes Yes

1.1 Purpose

The purpose of the Regional MM WF is to provide a quick and overall insights of MM ST Sales & Target details. This report helps us to understand the overall MM ST Sales & target details for respective Regions and products.

1.2 Scope

  • Geographic Scope: India.
  • Business Segment: SMB
  • Process Frequency: Weekly
  • Core Activity: To Review SMB Sales details
  • Key Distributors Covered: Lenovo

1.4 Responsibility and authority

  • Analyst: Nadeem
  • Process Owner: Nadeem
  • Escalation Manager: Sushruth Vasista
  • Approval Authority: Vishwanath Mosale

1.5 Escalation matrix: (Wyzmindz and Lenovo)

Escalation Matrix – WyzMindz Solutions Pvt Ltd India

Sl No. Name Designation Email ID
1 Sushruth Vasista Manager sushruth.vasista@wyzmindz.com
2 Vishwanath Mosale Director Vishwanath.mosale@wyzmindz.com

Escalation Matrix – Lenovo India Pvt Ltd

Sl No. Name Designation Email ID
1 Marlene Pinto Ops Head mpinto4@lenovo.com
2 Saurabh Agarwal Ops Director asaurabh@lenovo.com

1.6 RACI Matrix

RACI Matrix – WyzMindz Solutions Pvt Ltd India

Report / Process Responsible Accountable Consultation Informed
Regional MM WF Nadeem Nadeem Nadeem Lenovo Ind Pvt Ltd,Wyzmindz – Lenovo Process Team

1.7 Access Required

  • Outlook & Webmail Access
  • Access to Ms Office Suite

1.8 Data Dependencies

  • MM ST DSR

1.9 Legends

  • ST - Sell thru
  • MM - Mid Market
  • PAM – Partner Account Manager
  • CM – Client Manager

1.11 Schedule of Reporting

  • Frequency: Weekly

1.12 Process Flow Chart

PROCESS FLOW CHART

1.13 Steps of Procedure

  • Go to PAN India Consolidated sheet & change the below highlighted week# as 12 (as we are preparing the WF for week 12)

STEPS OF PROCEDURE

  • Open MM ST DSR,
  • Create a pivot, put RELATIONSHIP OWNER in filter and Region & Category (Select DSK, MOB & WORKSTATION) to rows and add calculated field “’CA’/1000”

STEPS OF PROCEDURE

  • Select MM 3540 from RELATIONSHIP OWNER and update in MM 3540 Actuals sheet of MM WF.

STEPS OF PROCEDURE

  • Remove Category and put Biz Group (select THINKSTATION & MOBILE WS) in rows of Pivot table and update in second table in same sheet (MWS and DTWS wise)

STEPS OF PROCEDURE

  • Similarly update the MM ROU numbers in MM ROU Actuals sheet by filtering RELATIONSHIP OWNER as MM ROU.
  • Go to Month & Qtr Outlook sheet, and update Relationship Owner and Region wise the MTD column with current month numbers from DSR.
  • Go to MM ST DSR, remove everything from the pivot, add ROL M in columns, CA in Values, PAM in Rows.

STEPS OF PROCEDURE

  • Go to People Dashboard sheet, and update in M3 MTD for all regions (update respective to current month M1/M2/M3), remove all the numbers from Wk 12 Commits and change header to Wk 13 (commits for next week)

STEPS OF PROCEDURE

  • Similarly, remove PAM from pivot of MM ST DSR and put CM in rows and update in dashboard.
  • After updating numbers in dashboard, remove CM from rows and put region and Biz Group (select only Think SnP & Visuals) and go to SnP & Standalone Visual sheet in WF and update region, ROLM & Biz group wise numbers.

STEPS OF PROCEDURE

  • Go to Week Commit sheet and remove all the data except headers.
  • Similarly, with QTR Funnel & Commit, Previous Week vs billed, & JBP Status, Events Planned & Help required from 4P remove all the data except headers.
  • Hide PAN India Consolidated, PAN India Consolidated MM ROU, PAN India Consolidated MM 3540, Partner to Pam Mapping, , Region Targets, MM 3540 Actuals & MM ROU Actuals sheets and bifurcate the file with 4 regions – East, North, South & West with only respecte region data in all sheets.
  • And share it to regional team for asking for commits for the next week (attached a file for ref.).

  • We need to share it before 9:30 AM on every Monday.

  • We will receive the commits by 6:30 PM on Monday.
  • After receiving commits from all the regions, we need to update the commits in DSR.
  • Update the actuals in MM 3540 Actuals & MM ROU Actuals sheets and in People Dashboard & SnP & Standalone Visual sheet as we did earlier.
  • Open the commits WF received from all regions and update the commits in Consolidated WF file.
  • Open North Commits shared go to North MM 3540 sheet and copy the commits and update in Consolidated file (as per below snapshots, copy the numbers/commits from received WF and update in Consolidated WF).

STEPS OF PROCEDURE STEPS OF PROCEDURE

  • Repeat the same steps for all products in MM ROU & MM 3540.

Note

If we are in week 10, we need to copy all the commits from week 11 till week 13 highlighted in red circle above).

  • Go to People Dashboard in North WF and copy WK 13 Commit and update in consolidated file
  • Check & update M3 Plans if there are any changes
  • Go to PXQ M3 sheet, copy the same numbers from Regional WF and update in Consolidated EF.
  • Go to Week Commit, QTR Funnel & Commit, Previous Week vs billed, & JBP Status, copy data from each of the regional WFs and update in Consolidated WF.
  • Once the MM Consolidated WF is updated completely, open “commits summary MM3540/MMROU” template/dashboard to update the WF numbers.
  • Remove Relationship Owner and Regional numbers from the dashboard (don’t remove any formulas).
  • Check & update “Last Week M3 Commits” (Update the yellow highlighted text to M1/M2 respective to current month)
  • Check & update “Gap - Wk 11 to Wk 12 Commits” (Update the yellow highlighted text to Wk9b to Wk 10 if we are preparing the report for week 10)
  • Copy the week 11 and week12 number from the East MM ROU WF (shown in below snap) and paste (Transposed) in dashboard.

STEPS OF PROCEDURE

  • Below is the Dashboard.

STEPS OF PROCEDURE

  • Copy Month wise and QTR wise number in above dashboard.
  • Repeat the same process for North, South & West along with MM 3540 regions too.
  • Go to MM OVERALL SELLTHRU dashboard and check if the overall number are matching.
  • Once completed, copy the dashboard and paste it in the trail mail which was published last week and attach the final consolidated WF, change the subject name & share it to the team.