SI UPDATE TO DATAMART

Process Overview

Field Description
Process Name SI Update to DataMart
Segment GSC
Process Family Lenovo India
Process User(s) Wyzmindz solutions pvt ltd
Process Purpose This report is instrumental in providing actionable insights, tracking performance, and supporting Lenovo’s sales strategies

Version Tag

Field Description
Version Tag V 1.0
Prepared By Sushruth Vasista
Date of Update/Revision 22-01-2024
Reviewed by Vishwanath Mosale
Approved by Vishwanath Mosale
Revision Details SOP Document Creation

Distribution & Access List

Designation Read Write Approval
Analyst Yes No No
Team Lead Yes Yes No
Manager Yes Yes Yes

1.1 Purpose

The purpose of this process is to define a standardized process for preparing, processing, and uploading quarterly coverage data into the Data Mart system for updating the SI Historical QW to ensure accuracy and consistency.

1.2 Scope

  • Geographic Scope: India.
  • Business Segment: GSC
  • Process Frequency: Daily
  • File preparation
  • Data processing using Python scripts
  • Data validation and cleanup
  • Upload to Data Mart

1.3 Business/Segment Overview

This process supports data reporting and analytics functions by ensuring that accurate quarterly coverage data is available in the Data Mart for downstream reporting, dashboards, and business insights.

1.4 Responsibility and authority

  • Analyst : Goutham P
  • Process Owner : Jeevitha
  • Process Manager : Navaneeth & Dayanand
  • Approval Authority : Vishwanath Mosale

1.5 Escalation matrix: (Wyzmindz and Lenovo)

Escalation Matrix – WyzMindz Solutions Pvt Ltd India

Level Name Designation Email ID
1 Sushruth Vasista Manager sushruth.vasista@wyzmindz.com
2 Vishwanath Mosale Director Vishwanath.mosale@wyzmindz.com

Escalation Matrix – Lenovo India Pvt Ltd

Level Name Designation Email ID
1 Debashish CONS Ops Head dbhadra@lenovo.com
2 Saurabh Agarwal Ops Director ASAURABH@lenovo.com

1.6 RACI Matrix

RACI Matrix – WyzMindz Solutions Pvt Ltd India

Report / Process Responsible Accountable Consultation Informed
SI Update to Data Mart Goutham P Goutham P Navaneeth Lenovo Ind Pvt Ltd, Wyzmindz Solutions pvt Ltd India

1.7 Access Required

  • DATAMART
  • Visual Studio Code

1.8 Overview of Tools

Level Tool Name URL Description
1 VS Code Application It’s a App used to code and extract data for our usage.

1.9 Legends

  • MTM: Machine Type Model (Product Number)
  • NA: Not Available

1.10 Dependencies

  • VS Code
  • DATAMART

1.11 Schedule of Reporting

The SI Update to DATAMART is structured for Quarterly flow to ensure timely data validation: - Frequency: Quarterly

1.12 Process Flow Chart

Process Flow Chart

1.13 Steps of Procedure

  • We need two files for this process
  • Last quarter’s uploaded file and this quarter’s final coverage file
  • Take the final coverage file of the quarter
  • Paste it in the given path
  • Now run the python code
  • After the code has completed running data will be saved in downloads.
  • Delete al contents from PCA($) column
  • Save the file as Upload Q4(present Quarter)
  • Upload the data to data mart.

1.14 Output Overview

  • Cleaned quarterly coverage file
  • File ready and successfully uploaded to Data Mart

1.15 Validation checklist

  • Correct input files used
  • Script executed without errors
  • Output file generated
  • PCA($) column cleared
  • File naming convention followed
  • Data successfully uploaded

1.16 Communication

  • Data will be given to Internal Team

1.17 Repository Details

Repository Details